Laserfiche WebLink
RECEIVED <br /> Elliott Russell,CO.DRMS 4/24/2025 <br /> 1313 Sherman Street APR 2 8 2025 <br /> Room 215 Colorado Division of Reclamation, <br /> Mining and Saftey <br /> Denver CO. 80203 <br /> George Quist,Quist Mining <br /> 1849 Trail Creek Rd. <br /> Lake George,CO.80827 <br /> Ammeded Application for Limited Impact Operation (110(1)) Reclamation <br /> Permit, and Acreage Reduction (Partial Release), Permit # M-2023-002. <br /> To all parties concerned.We want to release 3 acres from our Three-and Four-Point <br /> claims.We believe this is necessary because the 3 acres we want to let go do not contain <br /> enough pegmatite for us to continue mining.There are 1.14 acres that have been mined on <br /> Three and Four Point and .86 acres that are left to be mined containing large pegmatites for <br /> a total of 2 acres left on the Three- and Four-Point claims. However, on the .86 acres some <br /> of the area is overlapped onto the1.14 disturbed area and will not be re-dug(it's our <br /> estimate that at least .10 or more of the .86 will not be disturbed). Mining on the Three and <br /> Four Point .86 acre dig site will begin the 1st week in May 2025 and will not go over the 2 acre <br /> left remaining. <br /> We are waiving our right to the timeframes of rule 4.17.2 to coincide with the approval of <br /> AM1. This will help us to begin more quickly with moving the 3 released acres from the <br /> Three-and Four-Point Claims to the new 3-acre site on our Silver Microcline and Hilltop <br /> Claims. Mining and reclamation activities approved in M-2023-002 have yet to commence <br /> for the 3 acres on the Silver Microcline and Hilltop location therefore the release does not <br /> involve any disturbance evaluation of reclaimed lands. Mining will not begin on the Silver <br /> Microcline and Hilltop locations without the final approval from the Colorado DRMS, USDA <br /> Forest Service,Teller County and all other required entities. <br /> The need to move the 3 acres from the Three- and Four-Point Claims to the Silver <br /> Microcline and Hilltop Claim site is extremely important.The new site geologically is very <br /> prolific with large pegmatites critical to a successful mining operation. <br /> Thank you! Sincerely, George L. Quist <br /> - /ate//ad2s <br /> Signature Date <br />