Laserfiche WebLink
Cont. <br />Table 1.2. Re-Disturbed Reclamation Summary for Trapper Mine (2023).Page 2 <br />Parcel Year Re-Disturbed Acres Phase I Phase II Phase III Yearly Total <br />A-B-91 2023 1.9 1.9 1.9 1.6 <br />A-C-82 2023 20.6 20.6 20.6 20.6 <br />A-C-86A 2023 0.3 0.3 0.3 0.3 <br />A-C-87 2023 7.9 7.9 7.9 7.9 <br />CR-82 2023 18.1 18.1 18.1 18.1 <br />C-C-92 2023 11.6 11.6 11.6 11.6 <br />CR-92 2023 0.2 0.2 0.2 0.2 <br />C-C-93 2023 24.3 24.3 24.3 24.3 <br />CR-93 2023 81.8 81.8 81.8 81.8 <br />CR-94 2023 47.9 47.9 47.9 47.9 <br />D-B-04 2023 1.6 1.6 1.6 1.6 <br />D-C-04 2023 5.7 5.7 5.7 5.7 <br />E-A-83 2023 5.8 5.8 5.8 5.4 <br />E-A-84 2023 0.6 0.6 0.6 0.5 <br />E-A-85 2023 0.7 0.7 0.7 0.5 <br />E-B-83 2023 1.8 1.8 1.8 1.5 <br />E-B-84 2023 1.4 1.4 1.4 1.4 <br />E-B-85 2023 0.2 0.2 0.2 0.2 <br />H-C-03 2023 12.7 12.7 12.7 12.7 <br />H-C-04 2023 16.2 16.2 16.2 16.2 261.3 <br />A-C-87A 2024 1.45 1.45 1.45 1.45 <br />A-C-84B 2024 0.3 0.3 0.3 0.3 <br />A-C-85 2024 4.8 4.8 4.8 4.8 6.55 <br />632.8 619.0 609.0 586.1 Total <br />* Parcel F-AB-07 modifed with SL-24 PHII Bond Release application, previoulsy assumed PHI re-disturbance of 5.1 acres was incorrect. <br />GCR 3/24 <br />M:\ANNUAL REPORTS\DRMS23RPT\23RECtab1-2 <br />Bond Release Status