My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-04-08_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2025-04-08_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 10:35:11 AM
Creation date
4/28/2025 10:55:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/8/2025
Section_Exhibit Name
2.05 Operations and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br /> <br />Rule 2 Permits 2.05-16 Revision Date: 3/7/25 <br /> Revision No.: TR-166 <br />The topography following mining and reclamation activities is shown on the Postmining <br />Topography Map (Map 19). Cross sections relating the premining and postmining topographic <br />configurations are presented as the Premining and Postmining Cross Section Maps (Maps 20 and <br />20A). <br /> <br />Coal Handling Structures <br /> <br />Map l Surface ownership shows pre-mining contours and Map 19A Postmining Topography <br />Gossard Area shows post-mining contours of the loadout. All facilities not to be included as part <br />of the post-mining land use will be removed (see Section 2.05.5). After the facilities are removed, <br />the land will be regraded to blend with the existing undisturbed topography, retopsoiled and <br />revegetated in accordance with Section 2.05.4. <br /> <br />The detailed description of the various coal crushing, handling and loadout facilities for the <br />Colowyo operation is found under the Mine Facilities Section in 2.05.3. The location of the coal <br />processing facilities is found on the Existing Structures - North Map (Map 21), the Existing <br />Structures - South Map (Map 22) and the Existing Structures- Lower Wilson/South Taylor Map <br />(Map 22A). <br /> <br />Coal Processing Waste and Non-Coal Processing Waste <br /> <br />Not applicable. Colowyo uses dry crushing facility for coal preparation; no coal processing waste, <br />as defined in Rule 1.04 “DEFINITIONS”, is produced from any part of the mining operations. <br /> <br />Underground Development Waste <br /> <br />Not applicable. Colowyo is not conducting an underground operation. <br /> <br />Return of Coal Processing Waste to Abandon Workings <br /> <br />Not applicable. No coal processing waste as defined in Rule 1.04 “DEFINITIONS”, is produced <br />from any part of the Colowyo mining operations. <br /> <br />2.05.4 Reclamation Plan <br /> <br />The objective of the reclamation plan is to stabilize the soil, maintain hydrologic function, re- <br />establish appropriate vegetation, and to restore the approximate original contour of the mined area. <br />Ultimately, the areas being mined will be returned to an appropriate and productive post-mining <br />land use, with watersheds having their approximate pre-mining character. In general, the long <br />term appearance and beneficial uses of the mined area will be similar to that which would have <br />been encountered prior to mining activity. <br /> <br />The principal basis of Colowyo’s reclamation plan is to rebuild a post mine landscape that mimics <br />the natural terrain features, accounting for local slope aspects, steepness, and topographic features. <br />By incorporating variation in the terrain, the reclamation system will encourage the establishment, <br />succession, and persistence of mixed native vegetation communities. These efforts will facilitate
The URL can be used to link to this page
Your browser does not support the video tag.