Laserfiche WebLink
`"*\' MOUNT9�y <br /> — CANDY MOUNTAIN MINING COMPANY INC. <br /> Kiel Schleusner—Field Representative I CEO <br /> MINING COMPANY <br /> Ajax 1 Placer Claim <br /> EXHIBIT C — MINING PLAN <br /> 6.3.3 EXHIBIT C - Mining Plan (1) The purpose of the mining plan is to describe how mining will affect the <br /> permit area for the duration of the operation.This plan must be correlated to Exhibit E-Map. The description <br /> of the mining plan must be adequate to satisfy the requirements of Rule 3.1 and demonstrate compliance <br /> with Rule 3. At a minimum, the Operator/Applicant must include the following information: <br /> (a) specify the estimated dates that mining will commence and end. If the operation is intended to be <br /> an intermittent operation as defined in C.R.S. 34-32-103(6)(a)(II), the Applicant should include in <br /> this exhibit a statement that conforms to the provisions of Section 34-32-103(6)(a)(II), C.R.S. <br /> Ajax 1 is the claim that will be managed for reclamation activities. This claim has an ore pile that has been <br /> measured and scaled to roughly 6-7,000 tons of mid and high-grade gold & silver ore that was removed <br /> from the lode source historically. This claim has a large flat gravel working pad and established safe <br /> Wninrkinn areas niitsirla of nonsictent or cat travel araac <br /> Mining activities will be contained to removal of the historical ore pile, crushing the rock to a fine <br /> consistency, and processing it on a shaker table. The process that will be outlined will show that this is an <br /> in-line contained process that will prevent environmental impacts, human-introduced legacy damages, or <br /> short-term impedances to the area. Equipment utilized is contained to the direct working area only. There <br /> will be no lower near waterway access and usage for this project and the removal of the ore pile on-site. <br /> Equipment Setup & Preparation: <br /> Road access to the working area that will be permitted for operations has a history of becoming very <br /> rough and hard to access with standard trucks. Due to this challenge only traveling to the working area <br /> with equipment as little as possible will prevent undue damage to the road. <br /> BPMS will not provide road maintenance actions to the travel way. No new road maintenance will <br /> need to occur. <br /> All equipment will be brought up on trailers to be uinloarieri anri nlaneri within safe establishers flat <br /> historical working pads on-site. Equipment transferred to the actionable site will be limited to start and <br /> finish activities with no major equipment movement egress and ingress during mining activities. <br /> Reclamation equipment will be comprised primarily of a track hoe, with specialized low PSI ground impact <br /> tracks, and specialized attachments. This equipment will be used in the removal of the historical ore piles <br /> that need to be cleaned up, and the direct reclamation activities that will be enacted during and after <br /> mining actions have occurred. <br /> A jaw crusher, hammermill, small reverse helix trommel and a shaker table will be utilized in the proper <br /> and safe concentration of the valuable precious metals. These units will be installed at the flat open pad <br /> well away from the roadway, and in an area that will promote safety, viability, and continued use during <br /> the project without the risk of issues. Utilizing only water during the concentration and separation of <br /> values there will be zero introduction of any foreign chemicals, acids, or waste byproducts that are or <br /> could have damaaina effects to the ecology or environment of the forest. <br />