Laserfiche WebLink
Of COjU <br /> L,t r'1 fi e <br /> !,, COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> 1313 Sherman Street. Room 2 15. Denver.Colorado 80203 phi 30 3)866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET TR-6 <br /> JLC/AME <br /> File No.: M- 2001 -005 Site Name:Grisenti Farms Pit <br /> County Fremont TR# (DRMS Use only) <br /> Permittee:Riverbend Industries <br /> Operator(If Other than Permittee): RECEIVED <br /> Permittee Representative:Jerald Schnabel APR 24 <br /> 2025 <br /> Please provide a brief description of the proposed revision: t1011, <br /> Change the end use of the property from Wildlife Habitat to Agncultiral Hay Field Mining and Safety <br /> Proposal to change the existing seed mix to Dy-hard Alfalfa Seed Mix <br /> As defined by the Minerals Rules. a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR. <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "tiled for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR. you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal ola TR: however, it is up to the permittee to provide <br /> sufficient information to the Division to approk e the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 10c, 1 1 1, 112 construction <br /> materials, and 112 quarries S216 <br /> 112 hard rock (not DMO) S f 75 <br /> 1 10d, 1 12d(I. 2 or 3) S 1006 <br />