Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br />trenches,waste piles,drill pads and collar areas of underground workings,ponds, etc. <br />Construct drill pad 30x60 feet and upgrade 1,000 feet of access road. Drill pad will have a <br />two weeks. <br />6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br />including anticipated number of holes, diameter, depth,location, etc. Submit additional <br />pages if necessary: <br />A. Drill Pads: <br />Average Average <br />Quantity 1 Width (ft)30 Length (ft) 60 <br />B. Drill Holes: <br />Diameter <br />Quantity 3 Depth (ft) 300 in) 6 <br />C. Mud Pits <br />Average Average Average <br />Quantity 1 Width (ft) 5 Length (ft) 15 Depth (ft)5 <br />D. Described proposed underground work, including reopening of old workings, <br />advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br />disturbance,describe type,quantity and general dimensions: <br />Improve 1,000 feet of BLM road and build one drill pad. Drill 3 holes from the drill pad. <br />Road improvements will be made with least amount of disturbance. <br />Drill pad will be built with a bulldozer and excavator. <br />Care will be taken to not disturb large bushes and trees. <br />Form 2—Public File Page 6 of 14