Laserfiche WebLink
Holcim South Platte Combined SWSP April 14, 2025 <br /> Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, 5475, 5829, Ft 6243 Page 29 of 37 <br /> total surface area exposed exceed those amounts, an amendment will need to be <br /> filed with this office. <br /> 4. The total amount of groundwater to be consumed at each of the pits shall not exceed <br /> the values listed in Table C of this approval. Total consumption at each pit must not <br /> exceed these amounts unless an amendment is made to this plan. <br /> 5. Approval of this plan is for the purposes as stated herein. This office must first <br /> approve any additional uses for the water. Any future additional historical <br /> consumptive use credit given (e.g., agricultural water transfer) for these sites must <br /> consider all previous credits given. <br /> 6. All releases of replacement water must be sufficient to cover all out-of-priority <br /> depletions in time, place, and amount and must be made under the direction and/or <br /> the approval of the water commissioner(s). If approved prior, the release of <br /> replacement water may be aggregated to maximize beneficial use. The water <br /> commissioner(s) and/or the division engineer shall determine the rate and timing of <br /> an aggregated release. <br /> 7. The Applicant must replace all out-of-priority depletions and return flow obligations <br /> resulting from operation under this SWSP, including those lagged depletions and return <br /> flow obligations that occur to the stream after the expiration date of this SWSP. <br /> 8. Conveyance loss for delivery of replacement water is subject to assessment and <br /> modification as determined by the division engineer. The distance for assessment of <br /> conveyance loss will be based upon DWR stream miles or as approved by the Water <br /> Commissioner, and will be assessed from the point of release to the point of <br /> depletion/replacement. <br /> 9. The replacement water which is the subject of this plan cannot be sold or leased to <br /> any other entity unless prior approval is obtained from the state or division engineer. <br /> As a condition of subsequent renewals of this substitute water supply plan, the <br /> replacement water must be appurtenant to these sites until a plan or plans for <br /> augmentation are obtained. All replacement water must be concurrent with <br /> depletions in quantity, timing, and locations. According to affidavits dated February <br /> 29, 2012 and April 23, 2019, the Applicant dedicated the 13.5 shares of the Whitney <br /> Ditch Company, 96 shares of the Fulton Irrigating Ditch Company, and 5/12tns interest <br /> in the Zweck Ft Turner Ditch as replacement water solely for this SWSP for as long as <br /> there are depletions at these gravel pit sites or until such time as another <br /> replacement source is obtained. For the purposes of this SWSP, these affidavits will be <br /> accepted for the dedication of the shares; however, if the state engineer determines <br /> that a different affidavit or dedication process is necessary to assure proper <br />