Laserfiche WebLink
Exhibit D, Reclamation Plan 6.3.4 <br /> 1 a.)Areas that are approaching ground water.Areas that are approaching boundaries to a <br /> point where a three to one slope can no longer be achieved and areas that the owner <br /> deems unprofitable or unsightly, shall be reclaimed. Reclamation shall take place in the <br /> spring and fall for optimum results. <br /> 1 b.) 3:1 <br /> lc.)(i)3"of overburden/topsoil <br /> (ii)timing per 1 a. above. Dozer tracking perpendicular to slope to create seed bed. <br /> Gunnison conservation district recommendation is a minimum of 6 pounds per acre. <br /> Augmenting granite/gravel areas with 3 tons per acre topsoil/manure mix as tested. <br /> (Soil analysis report and recommendation letter from Eric McPhail of Gunnison <br /> Conservation District attached.) <br /> (iii)Seed mix: Sheep fescue-1,Sandberg bluegrass-1,Western wheatgrass-4.Total 6 <br /> pounds per acre. <br /> (iv) Broadcast with electric hand seeder and raked in method. Using <br /> Twice application rate. <br /> (v) Landscapers'erosion mat anchored with staples over seeded areas. <br /> (vi) No trees. <br /> (d) None <br /> (e)Waste rock removed. No openings, ditches or sediment control devices. <br /> (2) Cost of reclamation. <br /> Dirt work: <br /> 7.15 acres(7.52 minus existing roadway.37 acres)cover/grade 3"topsoil/overburden= <br /> 2884 cu yds. @ 5.00 cu yd. =$ 14420.00. <br /> Seed, mulch,fertilizer: <br /> 7.15 acres @ 400.00/acre =2860.00 <br /> 32 hrs labor @ 75.00/hr. =2520.00 <br />