My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-04-11_REVISION - M1988112 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2025-04-11_REVISION - M1988112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:52:02 AM
Creation date
4/14/2025 8:31:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/11/2025
Doc Name Note
Appendix D Thru Attachment E Binder 2 of 2
Doc Name
Request For Amendment To Permit
From
Battle Mountain Resources, Inc.
To
DRMS
Type & Sequence
AM4
Email Name
LJW
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revisions to Modeling Hydraulic Controls, West Pit Devon Hornvedt <br /> San Luis Project Newmont USA Limited <br /> TABLES <br /> 1. Well Coordinates and Elevations, West Pit Model <br /> 2. Calibration Targets-Steady State,Non-Pumping Simulation, West Pit Model <br /> 3. Calibration Targets-Transient, Pumping Simulation, West Pit Model <br /> 4. Comparison of Calibration Statistics for the Revised and Original West Pit Models. <br /> 5. Comparison of Hydraulic Conductivity Zone Values for the Revised and Original West Pit <br /> Models <br /> FIGURES <br /> 1. Model Domain and Boundary Conditions, West Pit Model <br /> 2. Hydraulic Conductivity Zonation, West Pit Model <br /> 3. West to East Cross-Section, West Pit Model <br /> 4. Potentiometric Surface and Calibration Residuals, Steady State,Non-Pumping Simulation <br /> 5. Potentiometric Surface and Calibration Residuals, Transient, Pumping Simulation <br /> 6. Observed vs. Simulated Heads, Steady State,Non-Pumping Simulation <br /> 7. Observed vs. Simulated Heads, Transient, Pumping Simulation <br /> 8. Groundwater Flowpaths, Transient, Pumping Simulation <br /> 9. Potentiometric Surface and Groundwater Flowpaths,No-Action Simulation <br /> 10. Potentiometric Surface and Groundwater Flowpaths, Alluvial Extraction Simulation <br /> 11. Potentiometric Surface (After 7 Years) and Groundwater Flowpaths, Partial Slurry Wall with <br /> No Pumping Simulation <br /> 12. Potentiometric Surface(After 7 Years)and Groundwater Flowpaths,Full Slurry Wall with No <br /> Pumping Simulation <br /> 13. Simulated Hydrographs of Well BF-5,Partial and Full Slurry Wall,Without and with Pumping <br /> 11. Potentiometric Surface (After 7 Years) and Groundwater Flowpaths, Partial Slurry Wall with <br /> No Pumping Simulation <br /> 12. Potentiometric Surface(After 7 Years)and Groundwater Flowpaths,Full Slurry Wall with No <br /> Pumping Simulation <br /> 14. Potentiometric Surface and Groundwater Flowpaths, Partial Slurry Wall with Pumping <br /> Simulation <br /> 15. Potentiometric Surface and Groundwater Flowpaths, Full Slurry Wall with Pumping <br /> Simulation <br /> May 2023 10 Engineering Analytics,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.