Laserfiche WebLink
Mining and Reclamation Permit Amend.-M-1988-112 <br /> Groundwater Management Plan Battle Mountain Resources,Inc. <br /> difference between the newer NAVD88 versus the historic NGVD29 projection in <br /> elevation is an increase of 4.15 feet. <br /> No changes are proposed to the sampling analytes currently monitored. No additional <br /> wells are proposed for groundwater sampling (unless well M-19 is replaced, in which <br /> case the replacement well will be included for groundwater sampling. Figure G-1 <br /> indicates the monitoring wells to be included in the monitoring program for water level <br /> measurement and placement of pressure transducers. <br /> April 2025 14 Engineering Analytics,Inc. <br />