Laserfiche WebLink
San Luis Permit Amendment M-1988-112 CDRMS <br /> Slurry Wall Battle Mountain Resources <br /> Section E.3.7 Slurry Wall Reclamation <br /> The slurry wall reclamation includes contouring of the surface to meet natural existing contours, <br /> placement of available topsoil from stockpiles for areas to be seeded per section E.2.1 as needed, <br /> and seeding per Section E.2 of the Approved 1989 Reclamation Plan as needed.Affected areas that <br /> were disturbed will be returned to their pre-construction condition. <br /> April 2025 2 <br />