Laserfiche WebLink
Ref. Page No. M2009-006 00129 <br /> Planting Total Cost/ Total Cost/ <br /> Nursery Stock I No./Acre I Cost/Plant Cost/ Plant Acre <br /> Ponderosa Pine 2 $ 15.00 $ 5.00 $ 20.00 $ 40.00 <br /> TOTAL $ 40.00 <br /> Fertilizer Required?: No <br /> Fertilizer Cost per Acre: <br /> Basic Machine: Tractor Fleet: 2 Operating Cost/Hour: $ 37.54 (Intl.Labor) <br /> Basic Machine: Skid Loader Fleet: 2 Operating Cost/Hour: $ 29.67 (Intl.Labor) <br /> Shift Basis: 8 hour <br /> Ownership Cost/Hour: $ 30.93 <br /> Basic Machine Operating Cost/Hour: $ 33.61 <br /> Misc. Cost/Hour: $ 4.11 <br /> Total Unit Cost/Hour: $ 68.65 <br /> Tilling/Site Prep.Required?: Yes <br /> Average gradient: 18 %(pos) Unadjusted hourly production: 10,000 SgFt/Hour <br /> Average site altitude: 5,680 feet Adjusted unit production: 9,465 SgFt/Hour <br /> Average working till distance: 100 feet Adjusted fleet production: 8,960 SgFt/Hour <br /> Job condition correction factors: (source) <br /> Operator skill: 0.90 (average) <br /> Till method: 1.00 (general) <br /> Visibility: 1.00 (average) <br />