Laserfiche WebLink
Ref. Page No.M2009-006 00125 <br /> Job condition correction factors: <br /> Job efficiency: 0.83 (lshifGday) <br /> Altitude: 1.00 (cATHandbook) <br /> Net correction: 0.83 <br /> Adjusted unit production: 1040.2 LCY/hour <br /> Adjusted fleet production: 1040.2 LCY/hour <br /> Fleet Size: 1 Dozer(s) Total Job Time: 14.29 Hours <br /> Unit Cost: $ 0.084 /LCY Contingency Factor: 1.15 <br /> Total lob Cost: $ 1,438.10 <br /> Rest of page intentionally left blank. <br />