Laserfiche WebLink
SSR Mining CC&V <br />VLF 2 Phase 3B/C Document No: <br />Function: <br />Effective <br />Date: <br />Page No: <br />NA-CCV-SER-SI 2 <br />Backfill <br />S&ER <br />07/15/24 <br />Page 1 of 4 <br />Overburden Fill <br />Zone DRMS Weekly Report <br /> <br /> <br /> <br /> <br />1. SHIFT REPORTS:. <br /> <br />Report Period: <br />Friday-Thursday <br />Ambient Temperature Weather Conditions <br />High Low Precipitation <br />Date: <br />03/21/25 – 3/27/25 54.2 9.7 0.02” precipitation <br />measured at Grassy Valley. <br />No snowfall was recorded <br />in Cripple Creek. <br /> <br />Observations & Comments <br />CC&V completed dumping the 9,835 low compaction lift, and began <br />dumping the 9,845 low compaction lift. Good rock and fines were <br />sourced from Globe Hil. <br /> <br />2. AREA OF BACKFILL: The Blue area highlights the 9,835 low compaction lift. The 9,845 low compaction lift is not visible in <br />the flight image. <br /> <br />3. <br /> <br />Docusign Envelope ID: 9FE4DBF1-5E38-47DD-9F75-DA531E9E9350