Laserfiche WebLink
DocuSign Envelope ID: E57F5175-22A3-437B-968E-B4A2CC6130FD DocuSign Envelope ID: C7D22D68-429F-4392-A864-A38BCEBA0576 <br />Newmont CC&V <br />VLF 2 Phase 3B/C <br />Document No: <br />Function: <br />Effective <br />Date: <br />Page No: <br />NA-CCV-SER-SI 2 <br />Backfill <br />S&ER <br />07/15/24 <br />Page 1 of 4 <br />Overburden Fill <br />Zone DRMS Weekly Report <br /> <br /> <br /> <br /> <br />1. SHIFT REPORTS:. <br /> <br />Report Period: <br />Friday-Thursday <br />Ambient Temperature Weather Conditions <br />High Low Precipitation <br />Date: <br />12/6/24 – 12/13/24 48.5 0.96 Yes 0.3” recorded at Rigi <br />3” of snowfall <br /> <br />Observations & Comments <br /> Finished dumping and compacting the 9,755 low compaction lift and <br />began the 9,765 low compaction lift. Good rock and fines were <br />sourced from Schist Island Phase 2, Globe Hill Phase 3 & 4 and South <br />Cresson Phase 2 mining areas. Snow was removed before progressing. <br /> <br />2. AREA OF BACKFILL: Dump progression map with Blue marking the areas where backfill was placed on the 9,765 low <br />compaction fill lift this week. The red and yellow shapes show the areas that are being installed as high compaction on the <br />9,755 and 9,760 elevations. (High compaction will be detailed in a separate report.) <br />3. <br />4. <br />Docusign Envelope ID: 2D05BC5C-367D-4FB5-8B05-BB74EFC171C9