Laserfiche WebLink
DocuSign Envelope ID: E57F5175-22A3-437B-968E-B4A2CC6130FD DocuSign Envelope ID: C7D22D68-429F-4392-A864-A38BCEBA0576 <br />Newmont CC&V <br />VLF 2 Phase 3B/C <br />Document No: <br />Function: <br />Effective <br />Date: <br />Page No: <br />NA-CCV-SER-SI 2 <br />Backfill <br />S&ER <br />07/15/24 <br />Page 1 of 4 <br />Overburden Fill <br />Zone DRMS Weekly Report <br /> <br /> <br /> <br /> <br />1. SHIFT REPORTS:. <br /> <br />Report Period: <br />Friday-Thursday <br />Ambient Temperature Weather <br />Conditions <br />High Low Precipitation <br />Date: <br />10/11/24 – 10/17/24 60.4 32.7 no <br /> <br />Observations & Comments <br />Completed dumping and compacting the 9,715 low compaction <br />lift and began dumping the 9,725 low compaction lift. Good <br />rock and fines were sourced from Globe Hill Phase 3 and South <br />Cresson Phase 2 mining areas. <br /> <br />2. AREA OF BACKFILL: Dump progression map with Blue marking the areas where backfill was placed on the 9715, red show <br />the areas where backfill was placed on the 9,725 this week. <br /> <br />Docusign Envelope ID: 554A5A9A-4857-49AD-9BB3-BAB4CCDAA7E3