Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> N/A <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> All underground core drill holes were plugged per Rule 5.4 and the Drill Hole <br /> Permanent Abandonment Reports were submitted in the 2013 Annual Report. <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> No additional reclamation is planned at this time. Site is secured with locked gates and <br /> portals are secured with heavy steel locked gates. <br /> Form 2—Public File Page 9 of 14 <br />