Laserfiche WebLink
Your City <br /> Fort Collins <br /> Your State <br /> CO <br /> Your Zip Code <br /> Maximum of 10 digits. (Example)80202 <br /> 80526 <br /> Email Address <br /> Enter a valid email address in this field to receive a confirmation e-mail. <br /> glesniak16@gmail.com <br /> Your Phone Number* (') <br /> Used only to follow up. <br /> 5125691278 <br /> Extension <br /> Alternate Phone Number(?) <br /> Used only to follow up. <br /> Alternate Phone Extension <br /> Connection to Operation <br /> Select all that apply <br /> Land Owner of affected land Structure Owner within 200' of affected land <br /> Mineral Owner Nearby Resident <br /> Adjacent Land Owner Concerned Citizen <br /> Government Agency Other <br /> DESCRIPTION OF COMMENT OR OBJECTION <br /> You are providing a comment or objection to the public record of a permitting action currently under review by the Division of <br /> Reclamation, Mining and Safety.This form is not intended for reporting of possible violations or illegal activity. Please be as specific <br /> as possible. <br /> Comment/Objection Narrative* <br /> I strongly object to the proposed conversion of the Cross Gold Mine's permit from a 110(2)to a 112d-3 <br /> designated mining operation.The application's request to increase the permit area from 9.99 acres to 205.7 <br /> acres,representing a staggering 195.71-acre expansion, poses unacceptable risks.This dramatic increase will <br /> inevitably lead to: <br /> -Significant environmental degradation:The substantial expansion will amplify impacts on local water <br /> resources,wildlife habitats,and air quality. Increased mining activity will heighten the risk of contamination and <br /> long term ecological damage. <br /> -Irreversible landscape alteration:The proposed expansion will drastically alter the natural landscape, <br /> impacting the scenic beauty and recreational value of the Nederland area. <br /> -Increased community disruption:The expansion will result in increased noise,traffic,and dust, negatively <br /> impacting the quality of life for residents. <br /> The sheer scale of this expansion necessitates a far more rigorous and transparent assessment of its potential <br /> environmental and community impacts than has been provided.Therefore,this application should be denied. <br /> Permitting Action Comment/Objection is Regarding <br /> New Permit Change to Existing Permit <br />