Laserfiche WebLink
EXHIBIT D <br /> (D) The Size Of Area(s) To Be Worked At Any One Time <br /> Mining will occur in blocks of 5-acre units. No more than 15 acres will be disturbed at any given time.See Image D.(D).l <br /> for layout of 5-acre mining blocks.A total area of 79.9 acres will be exploited in this permit. <br /> (E) An Approximate Timetable To Describe The Mining Operation. <br /> The following Table D.(E).1 - Mining Timetable describes the major components of the mining timeline.The majority <br /> of time will be spent continuously mining and reclaiming active mining blocks. <br /> TABLE D.(E).1 -MINING TIMETABLE <br /> Stage Duration Total Time <br /> Set Up of Screening Plant-Set up of water systems,recovery systems,scrubbers,water well setup. 2 months per location Project Start <br /> Prepping of Ore Body in the Mining Block (5 acres)-stripping of topsoil. Less than one week per block to <br /> Mining of the Ore Body(5 acres)-continuously mining and reclamation mining block. Less than one month <br /> Grading of Mined Block and Covering with Stockpiled Topsoil Less than one week per block 5 Years <br /> Seeding and Imprinting of Mining Block One day per block <br /> Post Mining Environmental Monitoring Entire project length;5 years post 5 Years <br /> mining monitoring <br /> Total Project Length Less than 5 years of mining;5 10 Years <br /> years of post-mining environmental <br /> monitoring. <br /> 18 <br /> HAROROCK/METAL MINING REGULAR(112)APPLICATION AuPt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1784 <br />