My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-17_PERMIT FILE - C1996083
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2025-03-17_PERMIT FILE - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:59:33 PM
Creation date
3/17/2025 1:58:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
3/17/2025
Doc Name
Identification of Interests
Section_Exhibit Name
Volume I 2.03 Legal, Financial, Compliance & Related Information
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3)(c) No administrative or judicial actions. <br />(3)(d) The violation has been abated. <br />(3)(e) The Applicant removed the coal mine waste from the edge of the outslope of Gob <br />Pile No 4, removed the CMW that flowed down the outslope of Gob Pile No 4, <br />restored all lateral ditches on the outslope of Gob Pile No 4 and restored <br />collection ditch D -D3. <br />(3)(f) The notice of violation was terminated August 7, 2012. <br />(3)(a) Identifying Numbers: <br />Bowie Resources, LLC <br />P.O. Box 483 <br />Paonia, CO 81428 <br />MSHA ID No. 05-04591 issued 4/30/97 <br />E I N - <br />Notice of Violation: CV -2013-001 <br />Issued by: Division of Reclamation Mining & Safety <br />Issued to: William Bear <br />Issued on: January 14, 2013 <br />(3)(b) Failure to obtain a technical revision for a modification to the terms or <br />requirements of the permit for design changes for a regulated structure as <br />required by Rule 2.08.4(2). Failure to obtain final approval before implementing a <br />technical revision as required by Rule 2.08.4(4). Failure to obtain approval of a <br />performance bond covering the surface acreage to be affected prior to disturbing <br />surface acreage as required by Rule 3.02.1(2). Failure to save topsoil and <br />subsoils before disturbance of areas affected by surface coal mining operations <br />as required by Rule 4.06.1(1). <br />(3)(c) No administrative or judicial actions. <br />(3)(d) The violation has been abated. <br />(3)(e) The Applicant provided all materials necessary to obtain approval for Technical <br />Revision No 76 to authorize disturbance, posted appropriate financial warranty <br />for existing disturbance and any additional proposed disturbance and saved all <br />topsoil in accordance with Rule 4.06.2. <br />(3)(f) The notice of violation was terminated February 27, 2013. <br />PR -14 2.03-10 06/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.