My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-14_PERMIT FILE - M2025016 (22)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2025016
>
2025-03-14_PERMIT FILE - M2025016 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 12:02:43 PM
Creation date
3/17/2025 9:54:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2025016
IBM Index Class Name
Permit File
Doc Date
3/14/2025
Doc Name Note
Exhibit L - Reclamation Costs
Doc Name
Application
From
Raptor Materials LLC
To
DRMS
Email Name
JR2
AME
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
// PAGE 9 <br />EXHIBIT L <br /> <br /> <br />Raptor Materials, LLC Cogburn Sand, Gravel, and Reservoir Project February 2025 <br />A Regular Impact (112) Construction Permit Application – Colorado Division of Reclamation Mining and Safety, Office of Mined Land Reclamation <br />Revegetation <br />Revegetation will occur following placement of topsoil on disturbed areas remaining at the time of <br />reclamation. As described in the above subsection, Topsoil, only reclaimed slopes above the static water <br />surface elevation in Pit P125B will be disturbed at the 5-year mark. Seeding will therefore occur over the <br />same exposed area as described in more detail in Exhibit E – Reclamation Plan, and according to seed mixes <br />and application methods presented in Table L, attached as an addendum to this Exhibit. <br /> <br />The cost estimate for revegetation, which assumes a 25% initial failure rate that will require re-seeding, is <br />based on unit costs taken from the recent DRMS-provided P124 Two Rivers (M2022-013) cost estimate and <br />is presented in Table 8 below. This unit cost includes the cost of seed and fertilizer, their application, tilling, <br />mulching, and nursey stock planting. Please note that seed costs are known to fluctuate seasonally and may <br />vary noticeably from the unit cost used here. The seed mixture includes a substitute for mulch in the <br />inclusion of a wheatgrass hybrid. The Division has historically agreed with and approved the inclusion of this <br />hybrid as a substitute for mulch. <br />Table 10. Revegetation Cost Estimate <br />Pit Exposed P125B S.A. above <br />WSEL [ac] <br />Estimated Failure <br />Rate <br />Initial + Reseeding <br />Area [sq.ft] Seed Cost/Acre Total Job Cost <br />P125B 5.7 25% 7.1 $2,134.95 $15,212 <br /> <br />Conveyor Decommissioning <br /> <br />An elevated conveyor will be used on-site both to transport material from Pit P125B, across the Last Chance <br />Ditch, into P125A, and to transport material from P125A to the existing conveyor that runs north-south along <br />the eastern border of the Cogburn site, to an offsite plant location. The Operations team estimated the <br />length of conveyor required based on proposed sequencing, offsite transportation delivery location, and the <br />active pit design. The conveyor, installed in modular 40-foot sections, is portable and will be <br />decommissioned and transported offsite for use elsewhere following removal of resources from the site. <br />Decommissioning will involve the removal of the conveyor sections and belting, and demolition and on-site <br />disposal of its supporting 2ft x 2ft x 6 ft concrete blocks. The conveyor itself is 3 feet wide. <br /> <br />The cost estimate for conveyor decommissioning, summarized in Table 7 below, is based on unit costs taken <br />from the recent DRMS-provided P124 Two Rivers (M2022-013) cost estimate. As consistent with this <br />estimate, an 89.2% location adjustment factor is considered for the decommissioning cost. <br />Table 11. Conveyor Decommissioning Cost Estimate <br />Conveyor Element Section Length [ft] No. of Sections Width [ft] Total Dimension Unit Cost Total Job Cost <br />Elevated Conveyor 125 3 3 1,125 [SF] $9.57/SF $10,766 <br />Concrete Blocks 6 10 N/A 60 [LF] $6.94/LF $416 <br />Total Conveyor Decommissioning Cost: $11,183 <br />Location Adjustment Factor: 0.892 <br />Adjusted Conveyor Decommissioning Cost: $9,975 <br />