My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-14_PERMIT FILE - M2025016 (22)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2025016
>
2025-03-14_PERMIT FILE - M2025016 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 12:02:43 PM
Creation date
3/17/2025 9:54:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2025016
IBM Index Class Name
Permit File
Doc Date
3/14/2025
Doc Name Note
Exhibit L - Reclamation Costs
Doc Name
Application
From
Raptor Materials LLC
To
DRMS
Email Name
JR2
AME
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
// PAGE 6 <br />EXHIBIT L <br /> <br /> <br />Raptor Materials, LLC Cogburn Sand, Gravel, and Reservoir Project February 2025 <br />A Regular Impact (112) Construction Permit Application – Colorado Division of Reclamation Mining and Safety, Office of Mined Land Reclamation <br />is expected to expand during grading and mixing, a swell factor was applied to these volumes. Likewise, a <br />shrinkage factor was applied to the material volume for compaction. Calculation of the regrade and liner <br />material volumes required for reclamation is presented in Table 4 below. <br />Table 6. Regrade and Liner Volume Calculations <br />Activity Wall Area [sq.ft] Wall Depth [ft] Keyway Length [ft] XS Keyway Area <br />[sq.ft] <br />Material Vol <br />[cu.ft] <br />Material Vol <br />[cu.yd] <br />Regrade 157,078 1 N/A N/A 157,078 5,818 <br />Liner 100,301 4 4,884 16 479,347 17,754 <br /> <br /> <br />Haul distance was calculated as an average of the of the distance of liner sources to the site: 3,919 feet from <br />the P115 Kurtz site (M1999-006), 2,836 feet from the P122 Bearson site (M2015-003), and 415 feet from on- <br />site sources, for an average haul distance of 2,390 feet. The source deposits contain extensive materials <br />suitable for use in constructing the liner including shale, claystone, clay, sandstone-claystone-siltstone and <br />sandstone-siltstone bedrock, clay lenses in the sand and gravel deposit, and overburden often comprised of <br />low plasticity sandy silty clay to silty sand. Excess topsoil has also been successfully used as a liner <br />construction material and could be used if excess material is available. <br /> <br />Typical liner installation as described in Exhibit E – Reclamation Plan is shown on Figure 1 and Figure 2 below, <br />which indicate dimensions used in the calculation of regrade area and liner and backfill volumes for this cost <br />estimate. <br /> <br /> <br />Figure 1. Typical Fully Reclaimed Liner and Backfill Construction for Wall Depths Shallower than 30 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.