Laserfiche WebLink
// PAGE 5 <br />EXHIBIT G <br /> <br /> <br /> <br />Raptor Materials, LLC Cogburn Sand, Gravel, and Reservoir Project February 2025 <br />A Regular Impact (112) Construction Permit Application – Colorado Division of Reclamation Mining and Safety, Office of Mined Land Reclamation <br />Table 4. VCI Storage Facilities (All Values in Acre-Feet) <br />Reservoir Active Capacity, a-f Dead Storage, a-f <br />112 1,552 0 <br />Dakolios 1,104 0 <br />Von Ohlen 1,300 0 <br />Kurtz 4,000 0 <br />Total <br /> <br />NOT TO EXCEED 7,500 <br />A-F PER YEAR plus refill <br />of 3,000 a-f <br />0 <br />SECTION 5 <br />The Operator/Applicant shall affirmatively state that the Operator/Applicant has acquired (or has applied for) <br />a National Pollutant Discharge Elimination System (NPDES) permit from the Water Quality Control Division at <br />the Colorado Department of Health, if necessary. <br /> <br />A Colorado Wastewater Discharge Permit System Permit has been applied for with the Colorado <br />Department of Health on November 20, 2024. The application and permit are provided as an addendum to <br />this Exhibit. Dewatering activities are discussed in Exhibit D. <br /> <br />The Wastewater Discharge Permit application provides information about the pump capacity and discharge <br />rates. Section (c) of Exhibit D: Extraction Plan provides details, and the AWES report addressing dewatering <br />is provided as an addendum to this Exhibit G. <br /> <br />The application provides for the lining of the extracted basins (please refer to the AWES Dewatering <br />Evaluation Report of 21 October 2024. Lining will involve the utilization of suitably derived on-site materials <br />to meet final 3H:1V slopes. Subsequently, the same materials may be compacted to satisfy standards for <br />lined basins as established and governed by the Colorado Department of Water Resources Office of the <br />State Engineer. Once operations near completion of any lined basin, the OSE will be contacted and the lined <br />basins will be approved by the OSE prior to use. The OSE approval letter will be provided to the OMLR as a <br />condition of the permit as evidence that the lined basin has met the specifications necessary to pass a liner <br />test as part of the OSE approval process. Consistent with conclusion in the AWES Report, lining of the <br />completed basins will have ‘will have a de-minimis effect on groundwater hydrology.’ The report continues, <br />adding that, ‘Predicted post lining head levels immediately up and downgradient of the barrier walls are <br />within the range of normal seasonal water table elevation changes.’ <br /> <br />