Laserfiche WebLink
-4- <br /> 12. Prima future(Post-mining)land use(check one): <br /> Cropland(CR) fn Pastureland(PL) General Agriculture(GA) <br /> 11 Rangeland(RL) _EIForestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) _rj Recreation(RC) Industrial/Commercial(IC) <br /> ElDeveloped Water Resources(WR) J1 Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one : <br /> .Q, Cropland(CR) X Pastureland(PL) General Agriculture(GA) <br /> Ii Rangeland(RL) Forestry(FR) El Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC)Developed Water Resources(WR} <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Mining will be done with front end loaders and material hauled off site by truck. <br /> 15. On Site Processing: 11 Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): The r1 .aterial will be moved to the processing equipment by <br /> front end loaders. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> No chemicals or acid-producing materials will be used or stored within the permit area. <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> N/A <br />