Laserfiche WebLink
-4- <br /> 12. Prima future(Post-mining)land use(check one): <br /> Cropland(CR) I`-1 Pastureland(PL) General Agriculture(GA) <br /> 11 Rangeland(RL) n Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) _ElRecreation(RC) Industrial/Commercial(IC) <br /> JJDeveloped Water Resources(WR) D Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one : <br /> ra Cropland(CR) 1� Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) = Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS)Ei <br /> Recreation(RC) O. <br /> Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Mining will be done with front end loaders and material hauled off site by truck. <br /> 15. On Site Processing: El Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): The material will be moved to the processing equipment by <br /> front end loaders. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> No chemicals or acid-producing materials will be used or stored within the permit area. <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> N/A <br />