My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-14_PERMIT FILE - C1980007
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2025-03-14_PERMIT FILE - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 12:47:32 PM
Creation date
3/14/2025 12:39:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
3/14/2025
Doc Name
pg 2.05-101 to 2.05-199
Section_Exhibit Name
2.05.5 & 2.05.6 Post-Mining Land Uses and Mitigation of Surface Coal Mining Operation Impacts
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine <br /> <br />2.05-119 Rev. 06/05- PR10, 03/06- PR10, 05/06- PR10, 11/060- TR107, 04/07- TR108, 09/07- PR12, 02/08- PR12; 11/10- MR372; 10/20- MR-452; <br /> 12/20- TR149; 12/21- TR150, 1/24-TR152, 2/25-MR486 <br />Dam as described below occurs, the monuments will be inspected for movement. The <br />results of the survey will be submitted to CDRMS in the semi-annual subsidence report. If <br />movement along the landslide appears to potentially damage the dam itself, CDRMS, the <br />Minnesota Reservoir Company, SEO, USFS and other appropriate agencies will be notified <br />by MCC***immediately***. <br />2)Frequency and Reporting <br />Monument Dam will be surveyed and the monuments on the dam axis monthly when E-Seam <br />longwall mining is occurring within one mile of the dam and the information will be reported semi- <br />annually. If mining is occurring outside the one-mile radius of the dam, the dam monuments will <br />be surveyed on an annual basis. <br /> B) Seismic Monitoring <br />In June of 2005, the mine installed one seismic monitoring station in the axis of the Monument <br />Dam, another in Sylvester Gulch, and two more above B seam longwall panel 24. The purpose of <br />installing these stations was to observe the seismic events actually related to mining longwall <br />panels at the West Elk Mine. Monitoring of the four seismographs commenced in June of 2005, <br />and information developed to characterize seismic response from mining activity in the vicinity of <br />the Monument Dam and Minnesota Reservoir. <br />Prior to the commencement of longwall mining in either the E-seam E10, E11, and E12 longwall <br />panels, an array of seismic stations to monitor microseismicity generated by subsidence will be <br />created. This array will consist of at least 4 to 5 strategically placed accelerometers and <br />seismometers that will collect seismic data. The accelerometer/seismometer already in place in <br />the area of the Monument Dam will be used as part of this new array. The array will consist of <br />equipment in cooperation with NIOSH or similar to other arrays established by NIOSH in the <br />North Fork Valley to monitor mining induced microseismicity, including those previously <br />established in Sylvester Gulch and over B seam longwall panel 24. This data will be transmitted <br />to data storage devices and to a central location where the data can be monitored on a real-time <br />basis. The final number, locations and installation of the seismometers and data storage devices <br />will be determined by an expert in the field of collecting and interpreting mining induced <br />seismicity <br />Monitoring information from the MCC seismic stations and NIOSH and USGS- generated data <br />collected from 1977 through 2005 was used to develop a stability analysis of the Monument Dam <br />by GEI Consultants, Inc of Englewood, Co (Exhibit 72, Material Damage Prevention Measures). <br />This stability analyses indicated the stability safety factor of the Monument Dam at that time was <br />less than 1.0. In January 2008, MCC completed the reconstruction of Monument Dam increasing <br />the static safety factor of the dam to 1.5 through the implementation of the measures discussed in <br />a subsequent Section 2.05.6(6)(f)(iv)(A-D), Detailed Description of Mitigating Measures. These <br />measures included, among other activities, the construction of a stability berm and buttress to <br />reduce the risk of movement of the dam itself and damage due to movement of the landslide located <br />on the left abutment of the dam. The construction and implementation of these structures and <br />activities will allow the dam to withstand a seismic event of at least magnitude 2.3 (Richter scale) <br />generating a peak ground acceleration (pga) of 0.16 g. As stated in the GEI report, a maximum <br />seismic event and pga anticipated to be generated by mining in the SOD will be ML 2.3 and 0.06
The URL can be used to link to this page
Your browser does not support the video tag.