Laserfiche WebLink
February 27, 2025 C-1980-007/West Elk Mine LDS <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 9 <br /> <br />The road is labelled “Sylvester Gulch Main Haul/Access Road” on the Map 53 series and was permitted according <br />to the design specifications for a haul road, but it is not used to haul coal or refuse, and MCC does not consider it a <br />“haul road”). The slump was in undisturbed soil. The area will continue to be monitored. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br /> The Box Canyon North was online. <br />The project to line silo 2 was still in progress. Concrete had begun to be poured. The project was estimated <br />to be completed in August 2025. <br />Work had not begun on the loadout drainage project as MCC continued to review the design. If significant <br />changes from the previously approved design are made the Permit Application Packet should be updated with a <br />Minor Revision. It was expected that work would begin on the project in April/May 2025. <br /> <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />N/A <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> <br /> <br /> <br /> <br />