My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-10_REVISION - P2007057 (2)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2007057
>
2025-03-10_REVISION - P2007057 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2025 10:48:39 AM
Creation date
3/11/2025 10:42:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2007057
IBM Index Class Name
Revision
Doc Date
3/10/2025
Doc Name
Request For Modification
From
ITC Resources, LLC
To
DRMS
Type & Sequence
MD2
Email Name
DMC
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULL13ULLR RIPPING WORK <br /> Task description: Rip 4.98 acre staging area and roads <br /> Site: Blue Streak Mine Permit Action: 2023-03-16 Review Permit/Job#: P2007057 <br /> PROJECT IDENTIFICATION <br /> Task#: 03A State: Colorado Abbreviation: None <br /> Date: 3/16/2023 County: Montrose Filename: 03a <br /> User: DMC <br /> Agency or organization name: DBMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D7R DS Series II LGP Horsepower: 240 <br /> Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: S92.78 NA <br /> Operating Cost/Hour: $79.33 100 <br /> Ripper Ownership Cost/Hour: $8.37 NA <br /> Ripper Operating Cost/Hour: $4.99 100 <br /> Operator Cost/Hour: $41.30 NA <br /> Total Unit Cost/Hour: $226.77 <br /> Total Fleet Cost/Hour: $226.77 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 4.98 acres Rip Depth(ft): 2.00 Volume: 16,069 BCY or CCY <br /> Source of estimated quantity: DRMS <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 2.45 feet/pass <br /> Average Ripping Width: 6.50 feet/pass <br /> Average Ripping Length: 100.00 feet/pass <br /> Average Dozer Speed: 88.00 feet/minute <br /> Average Maneuver Time; 0.25 minutes/pass <br /> Production per unit area: 0.646 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.646 Acres/hr <br /> Site Altitude: 6,300 feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.54 Acres/hr <br /> Adjusted Hourly Fleet Production: 0.54 Acres/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 9.29 Hours <br /> Unit cost: $423.066 Per acre Total job cost: $2,107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.