My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-10_REVISION - P2007057 (2)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2007057
>
2025-03-10_REVISION - P2007057 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2025 10:48:39 AM
Creation date
3/11/2025 10:42:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2007057
IBM Index Class Name
Revision
Doc Date
3/10/2025
Doc Name
Request For Modification
From
ITC Resources, LLC
To
DRMS
Type & Sequence
MD2
Email Name
DMC
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i 1.11.all lL\.1 a10..\.1:LL. L.V... al 1.ldA '• \tom.•\ flab.. ! 111 <br /> BULLDOZER WORK <br /> Task description: Grade waste piles/general earth work _ <br /> Site: Blue Streak Mine Permit Action: 2023-03-16 Review Permit/Job#: P2007057 <br /> PROJECT IDENTIFICATION <br /> Task#: 02A State: Colorado Abbreviation: None <br /> Date: 3/16/2023 County: Montrose Filename: 02a <br /> User: DMC <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D7R DS Series II LGP <br /> Horsepower: 240 <br /> ..Blade Type: St. .raight <br /> Attachment: 3-shank ripper <br /> Shift Basis: I per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $92.78 NA <br /> Operating Cost/Hour: $79.33 100 <br /> Ripper own. $8.37 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $4.99 100 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $226.77 <br /> Total Fleet Cost/Hour: $226.77 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 1,430 <br /> Swell factor: 1.000 <br /> Loose volume: 1,430 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly 800.0 LCY/hr <br /> production: <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push 15 % <br /> gradient: -__ <br /> Average site altitude: 6,300 feet <br /> Material weight: 3,3001bs/LCY <br /> Weight description: Decomposed rock-75%Rock,25%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0,750 j AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.