Laserfiche WebLink
USDA United States Forest South Park Ranger District PO Box 219 <br /> _�— Department of Service 320 US Highway 285 <br /> _ Agriculture Fairplay,CO 80440 <br /> 719-836-2031 <br /> Fax:719-836-3875 <br /> File Code: 2810 <br /> Date: February 26, 2025 <br /> Brent Rovedo <br /> Claimant/Operator <br /> 18049 East Bellewood Dr <br /> Aurora,CO 80015 <br /> Dear Mr. Brent Rovedo, <br /> I am writing regarding the 3 Toes Mine Plan of Operations(MPO)(2810-021210-MPO-2023-008) <br /> for lode exploration and mining related activities on the South Park Ranger District of the Pike <br /> National Forest. In my November 21, 2024 letter to you, I informed you that I had signed the <br /> Crystal Creek MPO Decision Notice(DN) on November 21, 2024 and instructed you on the final <br /> two steps necessary for MPO approval. <br /> I received your Design Criteria, signed by you, the operator, on December 16, 2024, that <br /> incorporated into Section IV-A the changes and additions that were identified in the DN. As per <br /> the Memorandum of Understanding between the Forest Service and the State of Colorado, <br /> Division of Reclamation, Mining, and Safety (DRMS), the DRMS is the lead bond authority and <br /> will be responsible for calculating your reclamation bond. This bond will need to be submitted to <br /> and approved by DRMS and the Forest Service in accordance with 36 CFR 228.13, prior to the <br /> authorization of your MPO. This bond will be used as a guarantee of faithful performance with <br /> the terms and conditions listed in the MPO. As a reminder, the bond can be adjusted during the <br /> term of the MPO in response to changes in the operations or to changes in the economy. Also, <br /> you may request a partial bond release following completion of the ground disturbing activities <br /> (i.e., all but monitoring). <br /> These last two steps conclude the stipulations listed in the DN. Therefore, I have conditionally <br /> approved your 3 Toes MPO with my signature in Section IX(attached). Operations are authorized <br /> to begin on June 1, 2025,and are authorized for 10 years,with completion of all activities including <br /> reclamation by December 31, 2035. <br /> Please be aware, this approval does not constitute permission to conduct activities that require <br /> other agency permits. You are responsible for obtaining all other necessary permits prior to <br /> operation. Furthermore, approval of this operating plan in no way authorizes, or in any way <br /> permits,a release or threat of a release of hazardous substances or pollutants into the environment <br /> that will require a response action or result in the incurrence of response costs. <br /> All designs,monitoring plans,and analyses required by the MPO are subject to the requirement of <br /> 36 CFR 228.8 that mining operations be conducted so as, where feasible, to minimize adverse <br /> environmental impacts on National Forest surface resources. The operator's compliance with this <br /> requirement in no way insulates or releases them from any liability or obligations that may arise <br /> with respect to its operations under any applicable environmental law, including but not limited to <br /> Caring for the Land and Serving People Printed anRecycled Paper <br />