My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-10_PERMIT FILE - M2025015 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2025015
>
2025-03-10_PERMIT FILE - M2025015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2025 8:55:20 AM
Creation date
3/10/2025 2:54:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2025015
IBM Index Class Name
Permit File
Doc Date
3/10/2025
Doc Name
Application
From
70 Ranch, L.L.C.
To
DRMS
Email Name
JPL
JLE
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
irrigation or fertilizer and is at least equal in extent of cover to the natural vegetation of the <br /> surrounding area. Seed will be drilled and mulched. <br /> The revegetation seeding and plant list on the Reclamation Plan Map contains the <br /> preferred species of grasses, shrubs and trees to be planted. <br /> Seeding will take place once final grading and replacement of topsoil have been completed <br /> for each phase. Timing of seeding will be consistent with standard horticultural practice for <br /> dryland applications -generally between late September and the middle of April to ensure <br /> there is adequate moisture for germination. <br /> (e) A plan or schedule indicating how and when reclamation will be implemented. <br /> Include: <br /> i. An estimate of the periods of time which will be required for the various stages or <br /> phases of reclamation. <br /> Reclamation for any given stage of mining may take up to five years to allow for successful <br /> revegetation. Please refer to the Timetable for Mining and Reclamation in Section (e) of <br /> Exhibit D. <br /> ii. A description of the size and location of each area to be reclaimed during each <br /> phase. <br /> Please refer to the Reclamation Plan Map (Exhibit F). <br /> iii. Outlining the sequence in which each stage or phase of reclamation will be carried <br /> out. <br /> Please refer to the Timetable for Mining and Reclamation in Section (e) of Exhibit D. <br /> (f) A description of: <br /> i. Final grading- maximum anticipated slope gradient or expected ranges thereof, <br /> The finished slopes of the reservoir will be no steeper than 3:1 for slopes mined at a 3:1. <br /> ii. Seeding- types, mixtures, quantities and time of application; <br /> Please refer to the Reclamation Plan Map for the list of plant materials and seeds to be <br /> utilized. The operator will seed during the appropriate season to ensure adequate <br /> moisture for germination and implement weed controls to allow the grasses to successfully <br /> establish. Additional plantings may be installed once the reservoirs are full of water and <br /> the grasses are established. <br /> iii. Fertilization- types, mixtures, quantities, and time of application; <br /> The type and application rate of fertilizer shall be determined based on a soil test at the <br /> time of final reclamation. <br /> iv. Revegetation- types of trees, shrubs, etc.; <br /> 70 Ranch-Section 25 Sand Mine—MLRB 112 Permit Application <br /> Exhibit E-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.