Laserfiche WebLink
Your City* <br /> Platteville <br /> Your State <br /> CO <br /> Your Zip Code <br /> Maximum of 10 digits. (Example)80202 <br /> 80651 <br /> Email Address <br /> Enter a valid email address in this field to receive a confirmation e-mail. <br /> wcaldwell@wje.com <br /> Your Phone Number* (') <br /> Used only to follow up. <br /> 3038838130 <br /> Extension <br /> Alternate Phone Number(?) <br /> Used only to follow up. <br /> Alternate Phone Extension <br /> Connection to Operation <br /> Select all that apply <br /> Land Owner of affected land Structure Owner within 200' of affected land <br /> Mineral Owner ✓ Nearby Resident <br /> Adjacent Land Owner Concerned Citizen <br /> Government Agency Other Adjacent property is a recreational area <br /> DESCRIPTION OF COMMENT OR OBJECTION <br /> You are providing a comment or objection to the public record of a permitting action currently under review by the Division of <br /> Reclamation, Mining and Safety.This form is not intended for reporting of possible violations or illegal activity. Please be as specific <br /> as possible. <br /> Comment/Objection Narrative* <br /> Sludge,from Milton, discharged into Evans#2 Ditch,then translated to Lake Christina, adjacent property, must <br /> be remedied and Mining operations must cease until mining operations are sufficient to exclude MILTON <br /> WATER&SLUDGE from future contamination of adjacent water and property. <br /> The west side of both MILTON and portions of the FEEDER canal, (Platte Valley Canal)have been for many <br /> years protected by BUFFER ZONES, (WILDLIFE Buffers),the current and proposed HAUL ROADS North of <br /> CR 34,adjacent to the WEST SIDE of Milton&the Canal IGNORE the buffer zones,thus there is drastic <br /> concern for LOSS of WILDLIFE and DISTUBANCE of NESTING. <br /> The residential area, (BBD Farms)to the west of the proposed mining area will be adversely affected by the <br /> haul trucks and traffic along the proposed haul roads, NORTH of CR 32. In a public the FRICO, manager <br /> declared that operations were to run 24 hours per day. Mitigation of DUST, NOISE,&Lighting, must be <br /> addressed. <br /> The submitted mining application,defines storage piles to a height of 150 ft. Soil/sand piles built to such a <br /> height are objectional and aesthetically unpleasant. <br /> Permitting Action Comment/Objection is Regarding <br /> New Permit Change to Existing Permit <br />