My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-02-21_REVISION - M2016081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2025-02-21_REVISION - M2016081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 8:25:02 AM
Creation date
2/24/2025 8:19:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
2/21/2025
Doc Name
Adequacy Review Response
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT G <br /> (D) Water Discharge Management Plan <br /> Table G.(D).1- Water Discharge Management Plan addresses runoff from disturbed areas, piled materials, and <br /> operating surfaces in disturbed areas. Minimal water will be used, primarily for dust control and essential <br /> operational needs. <br /> TABLE G.(D).1-Water Discharge Management Plan <br /> Plan Step Component Details <br /> 1 Mining Block Location • Conduct an analysis of the geography and hydrology of the mining site. <br /> • Identify water sources for mining and potential runoff areas <br /> • Consider the selection of the mining block's location with a focus on placing it to avoid all riparian habitats and other <br /> ecologically sensitive areas <br /> 2 Screening Plant Location • Select sites with high water absorption and low run-off potential <br /> • Avoid steep pitches,select areas that are generally flat. <br /> 3 Screening Plant Design • A dry process avoiding issues associated with washing of material <br /> • Any associated petrol chemicals will be stored in double containment <br /> 4 Processed Ore/Stacked material • Selection of site based on high porosity,level ground <br /> • Construction of bermed embankments surrounding the stacked ore. <br /> • Berms berms surrounding stacked material will help redirect runoff away from sensitive areas and towards <br /> treatment or containment areas <br /> • Spill Prevention and Control Implementing measures to prevent and control spills of oils,chemicals,or other <br /> contaminants that might mix with runoff. <br /> 8 Monitoring,Inspection,and • Rigorous monitoring of potential mining pollutants <br /> Documentation • Maintain detailed records of treatment and water quality <br /> 9 Post-Operation Water Management • Plan for site reclamation and stabilization <br /> • Implement long-term water management strategies <br /> • Seal bore holes <br /> 10 Regulatory Compliance and Reporting • Adhere to Colorado mining and environmental regulations <br /> • Develop a reporting system for local,state and federal compliance <br /> 11 Emergency Response and Contingency • Develop a spill response plan. <br /> Plans • Procedures for notifying authorities in emergencies <br /> 12 Plan Review and Updates • Schedule annual reviews <br /> • Adapt to new technologies,regulations,or environmental conditions <br /> 45 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION AuPt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1 970 306 1784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.