EXHIBIT E <br /> Upon completion,a final inspection of the site will ensure that all safety,environmental,and regulatory standards have <br /> been met.The photo documentation will be submitted as part of the final reclamation report,providing a detailed visual <br /> account that supports the project's commitment to safety,environmental stewardship,and returning the land to a stable, <br /> natural state suitable for future use. <br /> 5.0 Reclamation Monitoring <br /> Finally,the reclamation monitoring phase spans from the project start to five years post-mining.This continuous <br /> monitoring is essential to assess the success of the reclamation efforts,including vegetation establishment and noxious <br /> weed control,supported by regular documentation through photos and UAV mapping. <br /> 6.0 Summary Reclamation Table <br /> Table E.(C).1,Reclamation Plan shows the reclamation process in 7 major steps. <br /> TABLE E.(C).1 RECLAMATION PLAN <br /> Step Reclamation Step Time Of Year Expected Key Activities and Details Equipment <br /> Number Time-frame <br /> 1 Year-round 2 Months • Document ground pre and post mining • Dozer <br /> Site preparation for • Level ground • Scraper <br /> • Stockpile topsoil • Loader <br /> processing plant <br /> • Lidar <br /> 2 Prepping of ore body Year-round 24 Hours per • Stripping of topsoil with a bulldozer • Dozer <br /> in the mining block 5 acre block • Stockpiling topsoil along the mining block perimeter <br /> 3 Mining of block Year-round Continuous • Excavating ore from active mining block • Haul trucks <br /> with mining • Transport of ore to screening plant • Excavator <br /> • Return processed ore from the screening plant and deposit • Loader <br /> progressing towards the active excavation wall <br /> 4 Grading of mined Year-round Less than • Grading processed ore that has been redeposited in the active • Dozer <br /> block days mining pit. • Scraper <br /> • Using lidar technology for land restoration • Loader <br /> • Lidar <br /> Topsoil replacement Year-round Less than 7 • Covering graded area evenly with stockpiled topsoil • Dozer <br /> days • Ripping compacted areas • Scraper <br /> • Loader <br /> 6 Seeding and October,April 1 Day/block • Imprinter used to texture topsoil for optimal growing conditions. • Seeder, <br /> imprinting of mining • Seeder using approved seed mix • Imprinter <br /> block • Tractor <br /> 7 Decommissioning of End of project 3 Months • Removal of all mining related equipment and facilities. • Dozer <br /> plant and facilities. • Plugging of all wells • Excavator, <br /> • Loader. <br /> 8 Reclamation End of project Continuous • Monitoring of all reclamation efforts • Camera <br /> monitoring from project • Documentation of reclamation(photo,uav mapping) • Documentation <br /> start to 5 • Noxious weed treatment and control in accordance with GS • Computer <br /> years post • Database <br /> mining. <br /> 35 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION AuPt Industries LLC I PO Box 1424-Edwards,Colorado 81632 I 970 306 1784 <br />