Laserfiche WebLink
EXHIBIT D <br /> (C) All Water Diversions And Impoundments <br /> The West Side Placer will use a dry-screening process that requires no water for mineral processing. Because no <br /> water is involved,there is no need for storage or settling ponds,which reduces potential environmental impacts <br /> and eliminates hazards associated with large-scale water impoundments. <br /> 17 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION AuPt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1 970 306 1784 <br />