My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-02-21_REVISION - M2016081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2025-02-21_REVISION - M2016081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 8:25:02 AM
Creation date
2/24/2025 8:19:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
2/21/2025
Doc Name
Adequacy Review Response
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br /> 6.4.4 EXHIBIT D — Mining Plan <br /> (A) Description of The Method(s) of Mining to Be Employed <br /> The West Side Placer will employ placer mining methods.This includes the digging,moving ore,processing ore,returning <br /> ore to the active mining block and reclaiming. <br /> Mining activities will take place in five-acre blocks,with no more than three blocks disturbed at one time.Typically,one <br /> block is actively being mined,one is being stripped in preparation for mining,and one is in reclamation.Including the six- <br /> acre footprint for the screening plant,a maximum total of 21 acres will be disturbed at any given time. <br /> The following methods will sequentially employ when mining;refer to Table D.(A).1. <br /> (1) Prepping The Mining Block <br /> 1. Documentation <br /> A gps survey will be run on each mining block,marking out corner configurations for the block to be mined. <br /> Coordinates will be recorded and documented. Site photography will be used to document pre-mining state of each <br /> block. <br /> 2. Physical Prep of Mining Block <br /> A bulldozer will be used for the systematic stripping of topsoil across each 5-acre mining block.The bulldozer is tasked <br /> with removing a layer of topsoil,ranging from 8 to 16 inches in depth.Once removed,the topsoil will be carefully <br /> stockpiled along the perimeter of the mining block.This strategic placement aids in preserving the topsoil for future <br /> reclamation purposes.The topsoil removal process within a 24-hour period for each mining block(Three eight-hour <br /> shifts). <br /> (2) Mining of the Ore Body <br /> The ore body is situated directly beneath the topsoil layer.The excavator or scraper will systematically works its way <br /> downward,gradually creating a vertical wall along the interface of the ore body.This methodical approach ensures <br /> controlled excavation and stability of the mine walls.The excavation will advance methodically towards the far end of the <br /> mining block.A maximum of 15 acres(3 mining blocks)of the mining will be exposed for excavation at any given time. <br /> Each block will be mined in approximately a month or less. <br /> 1. Moving of Ore to Screening Plant <br /> Haul trucks or scrapers will be used to move ore from the active mining block to the screening plant.County roads <br /> and temporary haul roads will be used to move ore from the active mining block to screening plant. <br /> 2. Processing Ore at Screening Plant <br /> The primary function of the screening plant is to efficiently sort, and process excavated material,generating a 6 mesh <br /> minus sand product ready for off-site shipment.This screening plant will optionally operate within an industrial tent, <br /> 13 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION AuPt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1 970 306 1784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.