Laserfiche WebLink
-4- <br /> 12. Primarl future(Post-minis land use check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> ✓ Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use check one): <br /> ✓ Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Trackhoe and front end loaders are used to mine and load into haul trucks or conveyor for delivery to the processing plant. <br /> 15. On Site Processing: F&_/1 Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Material is processed into specification aggregates using crushers and screen plants <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This amendment increases the mine area by 26.62 acres, and adds a conveyor crossing over <br /> US Highway 85 and the UP Railroad to connect the mine area east of US Highway 85 to the <br /> mine area and plant site on the west side of US Highway 85. Also adding an under-drain <br /> between Phases 1 an 2 to regulate ground water elevations to historic levels. The mining <br /> method does not change, and the final reclamation methods do not change. The primary access <br /> remains as currently approved. <br />