Laserfiche WebLink
EXHIBIT 0 MINING PLAN(CONT) <br /> a 150 foot radius around each well head since we plan to leave <br /> the natural gravel slope in the reservoirs . The MAP EXHIBIT C1 <br /> MINING PLAN MAP shows how this will look . The gravel bands around <br /> the reservoirs will be used as a place for access roads to serve <br /> the reservoir exterior, ditches and oil and gas facilities . The <br /> setback areas will be reclaimed if disturbed, but most roads will <br /> remain for reservoir access as part of the Reclamation Plan . <br /> The material will be mined using loaders and track hoes <br /> (excavators) to remove material from the face . The material will <br /> then be delivered to the Plant for processing using haul trucks <br /> or a conveyor system. No blasting will take place at this mine. <br /> Reclamation will run concurrent with mining to control the <br /> amount of disturbed area in the mine at any one time. A <br /> reclamation cost estimate presented in EXHIBITI-covers the current <br /> and future conditions at the mine. This pit will be operated year <br /> around by L. G. Everist, Inc. , weather permitting. There may be <br /> periods when the demands for material are slow and no mining will <br /> take place, creating an intermittent operations situation. The <br /> maximum amount of disturbance may be 350 acres or less at any one <br /> time. Of these 350 acres, the Plant Site will cover 68 acres, <br /> containing processing plant/stockpile area, equipment storage <br /> area, temporary overburden and topsoil piles, drying pads and <br /> other axillary uses needed at the mine. The remaining 282 acres <br /> will contain 100 acres of pre mining stripped area, the active <br /> mining area, reclamation material stockpiles, slurry wall pad <br /> area, partially reclaimed area and reclaimed area waiting <br /> release. The reservoir below water areas is not included in the <br /> bond since no reclamation is required on that area. This bonded <br /> amount within the total disturbance area may change as the mine <br /> develops but prior to exceeding the bonded acers, a Technical <br /> Revision will be filed to increase the bond. <br /> Areas not included in the bonded area will remain in <br /> agricultural production and the responsibility for weed control <br /> and agricultural area maintenance is retained by the landowners . <br /> Review of MAP EXHIBIT C1 MINING PLAN MAP shows how we expect the <br /> site to look when mining has progressed to competition and prior <br /> to any backfilling. Note, the floor of the excavation is <br /> generally flat and the slopes into the reservoirs are 3h to 1v <br /> where mining is complete on the perimeter. <br /> Please refer to the MINING TIMETABLES for the estimated acreage <br /> of each area associated with the mining part of this operation. <br /> Mining equipment may include but is not limited to, front end <br /> loaders, scrapers, excavators, a drag line, dozers, off road haul <br /> trucks, dump trucks and a water truck. Processing equipment may <br /> L,G Everest, inc, Ragsdale Reservoirs Revised February 11, 2025 <br /> 18 <br />