Laserfiche WebLink
2. Concerns for Gravel Pit Liner Impacts of Local Groundwater Flow <br /> These concerns are addressed in the groundwater model and french drain design. <br /> 3. Reclamation SWSP and Augmentation Plan <br /> Lining of the reservoirs will occur prior to groundwater exposure, therefore an SWSP is not <br /> necessary for the pits during mining and reclamation. Water will not be collected in the <br /> reclaimed reservoir due to the slurry wall, therefore an augmentation plan is not required. <br /> 4. Existing Well with Permit No. 299707 <br /> This well is located near a residence outside of the permit area and will not be utilized by the <br /> operator. <br /> Evans Mining Resource <br /> January 2024 8 Lewicki&Associates <br />