Laserfiche WebLink
Substantial legal and financial commitments were made on December 16, 1976, when an <br />Agreement to 1) construct the Roadside North Portal and 2) supply approximately <br />13,450,000 tons of coal was executed. <br /> <br />(3) Surface mining activities within 300' of occupied dwellings - not applicable. <br /> <br />2.03.8 Permit Term Information <br />(1) Surface mining activity schedule - not applicable. <br /> <br />(2) Underground coal mining operations began in the permit area in 1899 and have run <br />continuously until the present time. Operations using current mining methods began in <br />1974. From 1974 to 2022, approximately 242 acres of surface lands were disturbed in <br />conjunction with mining operations. No disturbance of additional surface lands during the <br />life of the permit is planned. <br /> <br />The total area affected by coal extraction during the life of the mine is depicted on in Tab <br />Section 12, Table 12-2. <br /> <br />Mining ceased at the Roadside Portals on December 2, 1999. The current permit expires <br />January 3, 2028. <br /> <br />(3) Request for permit term greater than 5 years - not applicable. <br /> <br />2.03.9 Personal Injury and Property Damage Information <br />(1) A copy of an insurance certificate certifying that the applicant has a public liability <br />insurance policy in force for the coal mining operation for which the permit is sought is <br />provided in Figure 3-1. <br /> <br /> <br />RN-08 3-5 Rev 09/22