Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 3 of 3 <br />075A <br />Reseed Pit Areas with Dryland Mix #8 North of ]—jik-J7E-GE <br />Mehan Draw <br />$88,072.18 <br />1 <br />60.17 <br />$12,313.00 <br />SUBTOTALS: <br />4471.65 <br />$4,360,009.00 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02 <br />Total = <br />$88,072.18 <br />1.05 <br />Total = <br />$45,780.09 <br />2,072.54 <br />Total = <br />$151,399.05 <br />10.00 <br />Total = <br />$436,000.90 <br />TOTAL O & P = <br />$721,252.22 <br />CONTRACT AMOUNT (direct + O & P) = <br />$5,081,261.22 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />0.00 <br />4.61 <br />3.58 <br />CONTINGENCY: 0.00 <br />Total = 0.00 <br />Total = $234,246.14 <br />$181,909.15 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $1,137,407.51 <br />TOTAL BOND AMOUNT (direct + indirect) = $5,497,416.51 <br />CIIMCES Cost Estimating Software <br />