Laserfiche WebLink
Task description: Summa <br />Site: New Horizon North Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 <br />COST SUMMARY WORK <br />7 of Permit Renewal No.1 Tasks <br />Permit Action: RNl <br />State: Colorado <br />8/11/2017 County: <br />JDM <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />Montrose <br />DRMS <br />Permit/Job#: C2010089 <br />Abbreviation: None <br />Filename: C089-000 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />020 <br />021 <br />022 <br />023 <br />030 <br />031 <br />032 <br />040 <br />041 <br />042 <br />043 <br />044 <br />045 <br />046 <br />047 <br />048 <br />049 <br />055 <br />056 <br />057 <br />058 <br />059 <br />060 <br />061 <br />062 <br />Drill and Shoot Hi hwall BLASTING <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />147.81 <br />$55,290.00 <br />$1,671,040.00 <br />$1,215,594.00 <br />$9,375.00 <br />$5,520.00 <br />$5,918.00 <br />$5,612.00 <br />$1,011.00 <br />$776.00 <br />$4,136.00 <br />$140,574.00 <br />$26,118.00 <br />$7,417.00 <br />$2,846.00 <br />$29,180.00 <br />$6,532.00 <br />$734.00 <br />$1,255.00 <br />$7,519.00 <br />$10,108.00 <br />$6,458.00 <br />$948.00 <br />$164.00 <br />$862.00 <br />$292.00 <br />$450.00 <br />$733.00 <br />$145,440.00 <br />$26,538.00 <br />$36,443.00 <br />$36,443.00 <br />$52,249.00 <br />$8,423.00 <br />$1,969.00 <br />$15,574.00 <br />$13,316.00 <br />Backfill Final Pit with Overburden Stockpile TRUCK]. <br />795.18 <br />Re rade Trailing Spoil Ridges DOZER <br />1,264.64 <br />Regrade Facilities Area DOZER <br />9.75 <br />Regrade Overburden Stockpile Area DOZER <br />5.74 <br />Rip Facilities Area RIPPER <br />5.76 <br />Rip West Haul Road RIPPER <br />5.46 <br />Rip North Haul Road RIPPER <br />0.96 <br />Rip South Access Road RIPPER <br />0.74 <br />Rip Equipment Corridor Road RIPPER <br />4.02 <br />Rip All Topsoil Replacement Areas Prior to RIPPER <br />Reseeding <br />136.96 <br />Regrade West Haul Road DOZER <br />27.17 <br />Regrade North Haul Road DOZER <br />7.72 <br />Regrade South Access Road DOZER <br />2.96 <br />Regrade Equipment Corridor Road DOZER <br />30.36 <br />Finish Grade Pit Areas GRADER <br />44.71 <br />Finish Grade Facilities Area GRADER <br />5.02 <br />Finish Grade Overburden Stockpile Area GRADER <br />8.59 <br />Regrade Pond NHN-001 DOZER <br />29.79 <br />Regrade Pond NHN-002 DOZER <br />40.05 <br />Regrade Pond NHN-003 DOZER <br />25.59 <br />Regrade Ditch NHN-001 East DOZER <br />3.75 <br />Regrade Ditch NHN-001 West DOZER <br />0.65 <br />Regrade Ditch NHN-002 North DOZER <br />3.42 <br />Regrade Ditch NHN-002 South DOZER <br />1.16 <br />Regrade Ditch NHN-003 North DOZER <br />1.78 <br />Regrade Ditch NHN-003 South DOZER <br />2.91 <br />Reconstruct 2nd Park Lateral Irrigation Ditch NA <br />105.88 <br />Replace Topsoil from Stockpile to 2013 Pit Area TRUCK]. <br />14.97 <br />Replace Topsoil from Stockpile to 2014 Pit Area TRUCK]. <br />17.34 <br />Replace Topsoil from Stockpile to 2015 Pit Area TRUCK]. <br />17.34 <br />Replace Topsoil from Stockpile to 2016 Pit Area TRUCK]. <br />24.86 <br />Replace Topsoil from Stockpile to Facilities Area TRUCK]. <br />4.75 <br />Replace Topsoil from Stockpile to Topsoil DOZER <br />Stockpile Area <br />2.05 <br />Replace Topsoil from Stockpile Overburden TRUCK]. <br />Stockpile Are <br />8.78 <br />Replace Topsoil from Stockpile to West Haul Road I TRUCK]. <br />6.34 <br />