Laserfiche WebLink
Section 2.05.4 Page 1 January 2025 (MR-39) <br />Reclamation Plan <br /> <br />Introduction <br />This section describes the reclamation plan for the New Horizon North (NHN) Mine. <br /> <br />Section 2.05.4(2)(a) Reclamation Time Table <br />Table 2.05.4(2)(a)-1 presents the remaining reclamation time table. Historical details of this <br />backfilling and grading are provided in Section 2.05.4(2)(c), topsoiling is described in Section <br />2.05.4(2)(d), and revegetated is discussed in Section 2.05.4(2)(e). <br /> <br />Section 2.05.4(2)(b) Performance Bond for Mine Reclamation <br />Please see Section 3.02.2 for the current bond liability. <br /> <br />Section 2.05.4(2)(c) Backfilling and Grading <br />Please see a separate section devoted to this topic. <br /> <br />Section 2.05.4(2)(d) Topsoil Redistribution <br />Please see a separate section devoted to this topic <br /> <br />Section 2.05.4(2)(e) Revegetation <br />Please see a separate section devoted to this topic <br /> <br />Section 2.05.4(2)(f) Disposal of Debris and Materials Constituting Fire Hazards <br />Please see a separate section devoted to this topic <br /> <br />Section 2.05.4(2)(f) Air Pollution Control and Water Discharge Permits <br />A copy of the most recently approved air pollution control permit is included in Appendix <br />2.05.6(1)-1. A copy of the water discharge permit is on file at the New Horizon Mine office and <br />available for review at the Division’s request. <br /> <br />Table 2.05.4(2)(a)-1 <br />Reclamation Time Table <br />Activity Year <br />All disturbed areas have been reclaimed as of end of year 2023 <br /> <br />