My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-02-04_REVISION - M1991133 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991133
>
2025-02-04_REVISION - M1991133 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 8:21:07 AM
Creation date
2/4/2025 3:22:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991133
IBM Index Class Name
Revision
Doc Date
2/4/2025
Doc Name
Incompleteness Response
From
Robins Construction Real Estate
To
DRMS
Type & Sequence
AM2
Email Name
RAR
JLE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
modification will cause the Recharge Pond to intercept ground water. The objectors <br /> shall have 35 days from the date of the Applicants' notice to provide the Division <br /> Engineer with comments regarding the Applicants' proposed modification_ The <br /> Division Engineer shall consider any comments provided by the objectors, and shall <br /> provide the Applicants with a written approval or denial of the Applicants' proposed <br /> modification within 60 days of receiving the notice required by this paragraph. <br /> 12.B. Delivery of Augmentation Water to Recharge: Water shall be diverted <br /> under the Subject Water Rights at the river headgate of the Canon irrigating Ditch, <br /> carried through the Canon Irrigating Ditch, and diverted into the Recharge Pond_ <br /> Water may only be normally diverted under the Subject Water Rights between April <br /> 1 and November 1 of each year (`Irrigation Season"). However, pursuant to State <br /> Engineer Policy or decree entered in Case No. 15CW3024, the Division Engineer <br /> may have the ability to alter the presumptive irrigation season_ The Applicants shall <br /> measure the amount of water diverted into the Recharge Pond at a location and in a <br /> manner approved by the Division Engineer. After water has been diverted into the <br /> Recharge Pond, the water shall not be removed from the Recharge Pond_ <br /> To assure timely recharge of the unconfined aquifer from which Well No.Aug_ I <br /> withdraws water, the Applicants shall deliver water into the Recharge Pond at least <br /> twice during each Irrigation Season. Ideally, one of the required deliveries will take <br /> place in April or May, and the other in August or September. <br /> 12.13. Evaporation: Evaporation from the recharge pond shall be calculated as <br /> 0.38 acre-feet per year unless the size of the pond is altered pursuant to Paragraph <br /> 12.A.1 above. <br /> 12.C. Volume of Allowable Pumping: The amount of water which may be <br /> pumped from Well No. Aug. 1 shall be equal to the amount of pumping credit <br /> generated by recharging water diverted under the Subject Water Rights to the <br /> unconfined aquifer through the Recharge Pond_ Well No. Aug 1 may pump only <br /> when the Applicants have accumulated pumping credit available under this plan for <br /> augmentation. <br /> 12.C.1. Calculation of Pumping Credit The first 0.38 acre-feet diverted into the <br /> Recharge Pond each Irrigation Season shall be counted as evaporation. Of the <br /> remaining water diverted into the Recharge Pond each Irrigation Season, 50% shall <br /> be relinquished to the stream to replace return flows associated with historical use of <br /> the Subject Water Rights, and 50%will constitute pumping credit. <br /> 12.C.2. Carry-Over of Pumping Credit: Pumping credit accrued within an <br /> Irrigation Season shall be available through December 31 of the calendar year in <br /> which that Irrigation Season occurs, and may be carried over into the next calendar <br /> year as follows. The Applicants may pump from Well No. Aug. 1 any pumping credit <br /> accrued within that year's Irrigation Season plus any unused pumping credit accrued <br /> within the previous year's Irrigation Season, provided the Division Engineer has <br /> 0�3992 -7 <br /> Summit Engineering Job Num er: 240328CE 34 <br /> 719-589-6147 <br /> Alamosa, CO <br />
The URL can be used to link to this page
Your browser does not support the video tag.