Laserfiche WebLink
Siloam Stone, Inc. <br /> Bedrock Mine - M-1977-086 <br /> January 27, 2025 <br /> Current Reclamation Tasks Needed <br /> RECLAMATION ACTIVITY AREA DISCUSSION <br /> (ACRES) <br /> Backfill working face - 4000 cy <br /> Slab stone area 9. 65 Grade working face - 1500 cy <br /> Spread 6" Growth medium, grade and <br /> shape and revegetate . <br /> Resoiling and rough grading <br /> Partially reclaimed 12 . 67 complete. Needs final seedbed <br /> (not TSSA) preparation (discing) and <br /> revegetation. <br /> Minor surface preparation (raking) <br /> Temporary Slab Stone and broadcast seeding of bare areas <br /> Area (TSSA) 25. 75 (we estimate that will be 25% or <br /> less) <br /> No Resoiling or ripping needed <br /> No Reclamation required. Stone <br /> Stone Yard 13 . 55 yard will remain active after <br /> mining is complete. <br /> Topsoil stockpiles - Final grading and shaping a <br /> in partially 1 . 39 seeding. <br /> reclaimed areas <br />