My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-02-03_REVISION - M1997086
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997086
>
2025-02-03_REVISION - M1997086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:39:26 AM
Creation date
2/4/2025 7:30:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997086
IBM Index Class Name
Revision
Doc Date
2/3/2025
Doc Name
Request for Technical Revision
From
Siloam Stone, Inc.
To
DRMS
Type & Sequence
TR4
Email Name
JLC
AME
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1157.4;_ q .. . <br /> x <br /> SDI Mr ST. ?NrE, 1flec. <br /> ._Xi X . _ 5k11•70.!r' .sc 8' Y'_ i <br /> (719) 275-4275 • 315 N. 7TH STREET • CANON CITY, CO 81212 • FAX: (719) 275-9050 <br /> January 27, 2025 <br /> Attn: Jocelyn Carter <br /> Division of Reclamation, Mining and Safety <br /> 1313 Sherman St, Suite 215 <br /> Denver, CO 80215 RECEIVED <br /> Dear Jocelyn; Fri 03 ?l?5 <br /> DIVISION OF RECLAMATION <br /> RE Technical Revision MINING AND SAFTEY <br /> Bedrock Mine #1 - Permit M-1997-086 <br /> Attached is a Technical Revision Form Cover Sheet, TR Map updated from the <br /> last annual report and a check for the required fee of $216. 00 . <br /> This TR is to reduce the amount of growth medium to be spread on the seed <br /> bed from 12 inches to 6 inches . The 3 existing growth medium piles on in the <br /> Partially Reclaimed area contain approximately 25, 800 cubic yards, more than <br /> enough for the 7, 785 cubic yards needed to cover the 9 . 97 acres needing resoiling <br /> and seeding in the slab stone mining area. The volume of each pile is show <br /> on the map and any remaining soil will be used for reclamation on the surrounding <br /> mine. <br /> We also request that the need to use mulch on the seed bed be removed <br /> from the reclamation plan. This area is prone to high wind events that would <br /> just scatter any mulch over a large area surrounding the mine and would provide <br /> no benefit during reclamation. <br /> Approximately 8 . 97 acres was final graded and resoiled since March 2024, <br /> reducing the Slab Stone mining area to 9. 62 acres. The attached table outlines <br /> for bonding purposes, the work needed to complete reclamation at this time. <br /> Thank you for your help and if you have aa\ny questions please call or <br /> e-mail me. <br /> Respectfully Submitted <br /> .-/ems(/ <br /> atthew Mueller <br /> President <br /> enclosures <br /> ecc Environment, Inc. <br /> File <br /> siloam@@siloamstone.com www.siloamstone.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.