Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#004 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Spread topsoil over 25 acres <br /> Site: Ted Franciscotti Pit#1 Permit Action: 2024 Inspection Permit/Job#: M2007006 <br /> PROJECT IDENTIFICATION <br /> Task#: 004 State: Colorado Abbreviation: None <br /> Date: 1/2/2025 County: Huerfano Filename: M006-004 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D7R DS XR Series II <br /> Horsepower: 240 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $90.24 NA <br /> Operating Cost/Hour: $78.95 100 <br /> Ripper own. $9.25 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $1.30 25 <br /> Operator Cost/Hour: $38.59 NA <br /> Total unit Cost/Hour: $218.33 <br /> Total Fleet Cost/Hour: $218.33 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 20,167 <br /> Swell factor: 1.215 <br /> Loose volume: 24,503 LCY <br /> Source of estimated volume: 6"deep over 25 acres <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 280 feet <br /> Unadjusted hourly 324.4 LCY/hr <br /> production: <br /> Materials consistency description: Partly consolidated stockpile 1.1 <br /> Average push -5% <br /> gradient: <br /> Average site altitude: 6,100 feet <br /> Material weight: 1,6001bs/LCY <br /> Weight description: Top Soil <br /> Job Condition Correction Factor Source <br />