Cripple Creek & Victor Gold Mining Company <br />Valley Leach Facility 2 Phase 3 <br />Stage B Subgrade and Leak Detection Record of Construction <br />Appendix F.2 - Construction Photographs <br /> <br /> <br />Page 3 <br /> <br />Photo 5 – Owner placed structural fill leveling by dozer. (June 14, 2024) <br /> <br />Photo 6 – Material being cut from slope as overburden. (July 3, 2024) <br />