Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Valley Leach Facility 2 <br />Phase 3 Stage B Subgrade and Leak Detection Record of Construction <br />Photograph Log <br />PHOTO <br />NUMBER PHOTOGRAPH DESCRIPTION DATE TAKEN PAGE <br />1 Material being cut from slope as overburden. March 27, 2024 1 <br />2 Material being cut from slope as overburden. May 9, 2024 1 <br />3 Overburden material from cut being hauled away. June 4, 2024 2 <br />4 Structural fill compaction against keyed in slope. June 13, 2024 2 <br />5 Owner placed structrural fill leveling by dozer. June 14, 2024 3 <br />6 Material being cut from slope as overburden. July 3, 2024 3 <br />7 Leak Detection Trench 2 soil liner fill plug. September 9, 2024 4 <br />8 Leak Detection Trench 2 progress. September 9,2024 4 <br />9 Leak Detection Trench 2 upstream end cap. September 16, 2024 5 <br />10 Leak Detection Trench 1 progress. September 19, 2024 5 <br />11 Leak Detection Trench 1 progress. September 30, 2024 6 <br />Page 1 of 1