Newmont Mining Corporation Cripple Creek & Victor Gold Mine 2024 CQA VLF2 P3 Stage B NewFields Job No. 475.0106.069 Week Ending Friday, June 07, 2024 <br /> <br />Page 2 <br /> <br />1.0 CC&V AND CONTRACTOR OPERATIONS <br /> Earthworks <br />1.1.1 Dump 1/Stage B Cut Sloping <br />Holcim continued to slope to grade on the existing Dump 1 area. Overburden material was <br />pushed down a placed into stockpiles by three to four dozers. <br />CC&V Operations continued to haul away overburden from the Stage B project limits. <br />Overburden material was loaded into haul trucks and hauled to the active area of VLF2 Phase 2/3 <br />and placed. <br />Figure 1 provides the location of the approximate push and load out area. <br />1.1.2 Structural Fill <br />Holcim began to place structural fill on the southern fill area within the VLF2 Phase 3 Stage B <br />project limits. An excavator loaded two 30 ton haul trucks with 2-foot minus material which then <br />delivered the material to a D6 or D8 dozer. The material was placed in maximum two-foot-thick <br />loose lifts. Each lift was compacted utilizing a varied haulage traffic pattern and with a minimum <br />of two total passes by a CAT CS56 vibratory sheepsfoot roller. One pass was considered forward <br />and back along the same line. <br />Figure 1 provides the location of the approximate fill area. <br />1.1.3 Leak Detection Trenches <br />No work during the week. <br /> Laboratory Testing <br />None. <br />2.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel met with Holcim (Tim Provost) daily to discuss project specifications. <br /> NewFields personnel met with CC&V Operations and Technical Services daily to discuss <br />overburden material removal. <br /> NewFields personnel met with Evan Fonger, Daniel Egley, and Antonio Matarese (CC&V <br />Projects) daily to discuss safety and project progress. <br />3.0 MISCELLANEOUS, ISSUES, AND CONCERNS <br />None.